Public Protection & Debris Netting
Additional protection designed to help safeguard workers, pedestrians and surrounding areas.
Your guide to the service · 24 key pointsWhat this service covers
Additional protection considered around construction work areas.
Debris netting requirements discussed with the main scaffold arrangement.
Planning around pedestrian routes and neighbouring spaces.
Protection needs assessed alongside the activities taking place above.
Describe the work and the surrounding public or occupied areas.
Identify boundaries, entrances and pedestrian movements close to the scaffold.
Netting and other protection measures are selected around the assessed requirement.
The scope and limitations of the agreed protection measures are explained before use.
Planning your requirement
- Your location
Send the property address, postcode and the exact areas where access is needed.
- Project information
Provide photographs, drawings and a description of the planned work so the team can understand the requirement.
- Site assessment
A site visit may be required to clarify access, dimensions and project conditions before the scope is confirmed.
- Access constraints
Tell us about narrow routes, neighbouring properties, occupied spaces and restrictions on deliveries.
- Coordination with trades
Share the relevant contractor’s requirements so the proposed service fits the work being carried out.
- Dates and programme
Give your preferred start date, expected duration and any important project milestones.
- Permissions and design
Any identified permission, design or site-specific requirement is discussed as part of planning the work.
- Clear scope
The quotation should set out the agreed service, inclusions and any separately discussed requirements.
Delivery, support & next steps
- Agree the quotation
Review the proposed scope, timing and hire arrangements with the team before confirming the work.
- Prepare for delivery
Agree site access and delivery arrangements with the responsible person at the property.
- Installation programme
The installation sequence is coordinated with the agreed site requirements and the contractor’s programme.
- Use for the agreed work
The scaffold is provided for the agreed project use; raise any proposed change with the team before work changes.
- Inspection arrangements
Discuss the inspection arrangements applicable to your project and the available supporting information.
- Alterations and support
Contact the team if trades need different access, the work scope changes or an alteration is required.
- Hire extensions
Tell us early if completion dates move so any revised hire arrangements can be discussed.
- Dismantling and removal
When the work is complete, contact the team to agree access, timing and removal arrangements.
Let’s plan your access.
Share your address, planned work and preferred dates for a free quotation.
