Project-specific scaffold design for complex structures, unusual layouts and challenging access requirements.
27 points to guide your enquiryA brief the designer can assess
- The building
Provide the address, building dimensions, elevations, available drawings and the areas requiring access.
- The work
Describe the trades, work sequence, number of working levels and activities the scaffold will support.
- Loads and materials
Identify intended platform loads, loading bays, material storage and any mechanical handling interfaces.
- Ground and support
Share foundation conditions, basements, openings, support limitations and relevant structural information.
- Ties and anchors
Identify the building fabric, potential tie locations and restrictions for the designer to review.
- Weather protection
Explain any sheeting, netting or temporary roof requirements; these affect the design brief and wind loading.
- Public and occupied areas
Show entrances, walkways, escape routes, neighbouring properties and areas that must stay operational.
- Site constraints
Identify overhead lines, restricted delivery access and interfaces with hoists, cranes or other temporary works.
- Programme
Provide construction stages, expected hire duration and anticipated changes to the access arrangement.
Select the appropriate design route
- Recognised configurations
HSE requires strength and stability calculations unless the relevant calculations already exist or the arrangement follows a generally recognised standard configuration.
- Tube and fitting
TG20 addresses tube-and-fitting scaffolding. Check that the proposed configuration and conditions are within the applicable guidance or compliance sheet.
- System scaffolding
TG30 and the relevant manufacturer’s instructions address system scaffolding. Confirm applicability to the actual system and configuration.
- Bespoke arrangements
Where the arrangement falls outside the relevant guidance or manufacturer’s scope, obtain the required design and calculations from a competent designer.
- Check the assumptions
Review geometry, loading, foundations, ties, wind exposure, sheeting and other stated design assumptions against the site.
- Design responsibilities
Agree who provides the design brief, design, checking and coordination with the project’s temporary works arrangements.
- Design deliverables
Specify drawings, calculations, compliance sheets, design limitations and any checking or issue requirements needed for the project.
- Membership and guidance
NASC makes TG20 and TG30 compliance sheets available to members and non-members. A compliance sheet alone does not establish NASC membership.
- Before erection
Make the agreed current information available to the competent people planning and supervising the scaffold work.
Control changes throughout the hire
- Correct revision
Identify the current drawing or compliance-sheet revision and communicate it to the people carrying out the work.
- Erection sequence
Coordinate the assembly, tying, bracing and site interfaces with the relevant plan and method.
- Completion review
Agree checks against the design or compliance information before handover for use.
- Safe-use limits
Communicate the permitted loading, work areas and restrictions to the scaffold user.
- Proposed changes
Refer changes to dimensions, ties, loading, sheeting or intended use for review before alteration.
- Other trades
Do not assume another trade can remove or relocate scaffold components to suit its work.
- Inspections
Agree competent inspection arrangements and how observations requiring design input will be escalated.
- Dismantling
Review sequencing, remaining stability and any project-specific constraints before scaffold removal.
- A relevant proposal
Send the brief and required deliverables to discuss the design scope, resources and quotation for your project.
Guidance reviewed 6 November 2026: HSE scaffold guidance · NASC compliance-sheet guidance. These references explain the planning requirements; the company’s project-specific arrangements and evidence must be confirmed for your work.
Want to know more?
Send your questions by email or explore our company information.
TG20, TG30 and project-specific design
Understand the guidance routes, the design brief and the questions to resolve with the competent designer.
Read the scaffold safety guide